App - 62 App - 62
APPENDIXES
Appendix 4.11 Link refresh time of master station/local station
This section indicates the link refresh time of the master/local station (increase of END
processing time at the programmable controller CPU).
(1) Remote net ver.1 mode, remote net ver.2 mode
[Expression]
KM1+(KM2+KM3) E+(No. of CC-Link modules-1) KM4 [ms]
E= RX+RY+SB
16
+RWw+RWr+SW
RX
: Total points of the remote input (RX) refreshed by the master/local
station
RY
: Total points of the remote output (RY) refreshed by the master/local
station
RWw : Total points of the remote register (RWw) refreshed by the master/local
station
RWr : Total points of the remote register (RWr) refreshed by the master/local
station
SB
: Total points of the link special relay (SB) refreshed by the master/local
station
SW
: Total points of the link special register (SW) refreshed by the
master/local station
KM1, KM2, KM3, KM4
: Constant
KM1
CPU type
Master
station/
Local station
With block
guarantee of cyclic
data per station
function set
Without block
guarantee of cyclic
data per station
function set
KM2 ( 10
-3
) KM3
( 10
-3
) KM4
Master station
0.42
0.32
L02CPU
Local station
0.70
0.60
0.38 0.05 0.2
Master station
0.25
0.13
L26CPU-BT
Local station
0.43
0.30
0.23 0.03 0.2
Master station
0.38
0.20
Head
module
Local station
0.65
0.45
0.35 0.05 0.2
POINT
The number of CC-Link modules in the expression includes the built-in CC-Link
function.
(Example) When using the L26CPU-BT and the LJ61BT11 is mounted, the number
of CC-Link modules counted is two.
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......