Index - 1 Index - 1
INDEX
[A]
Applicable system .......................................... 5- 3
Automatic CC-Link startup............................ 8-63
Automatic return function .............................. 8-23
Automatic update buffer............................App-16
[B]
Block guarantee of cyclic data per station.... 8-47
Buffer memory list ......................................... 3-20
[C]
CC-Link diagnostics .................................... 15-33
CC-Link ver. installation/parameter matching
status .........................................................App-38
Communication buffer...............................App-15
Communication between the master station and
intelligent device stations ............................. 13- 1
Communication with intelligent device stations
....................................................................... 8-15
Communication with local stations ................ 8- 8
Communication with remote device stations
........................................................................ 8- 3
Communication with remote I/O stations
........................................................................ 8- 1
Compatible CC-Link ver. information .......App-38
Completion status of remote device station
initialization procedure ..............................App-24
Connectable modules .................................... 5- 3
Connection cable............................................ 3- 1
Connecting modules ...................................... 6- 5
CPU monitoring time setting .....................App-29
Creating a check sheet ............................... 15-40
Current link scan time ...............................App-32
Cyclic transmission........................................A-16
[D]
Data link processing time..........................App-40
Data link restart .........................................App-22
Data link restart acceptance .....................App-23
Data link restart complete .........................App-23
Data link restart result ...............................App-29
Data link status setting in case of master station
programmable controller CPU failure ........... 8-24
Data link stop.............................................App-22
Data link stop acceptance ........................ App-23
Data link stop complete ............................ App-23
Data link stop result .................................. App-29
Data link stop/restart......................................8-73
Dedicated instruction list.................................9- 1
Dedicated instructions ....................................9- 1
Delay timer information............................. App-32
Detailed LED display status........ App-30, App-31
Details of the I/O signals............................. App-1
Differences between the L series master/local
module and QJ61BT11N.......................... App-67
[E]
EMC ............................................................... A- 8
Error codes...................................................15-19
Error history of the module ..........................15-20
Error invalid station setting function ..............8-66
Error invalid station specified status
..................................................... App-25, App-33
Event issuance for the interrupt program......8-60
Example of communication between the master
station and local stations ..............................12- 1
Example of communication between the master
station and remote device stations...............11- 1
Example of communication between the master
station and remove I/O stations....................10- 1
Execution status of remote device station
initialization procedure .............................. App-24
Expanded cyclic setting .................................3-13
External dimensions ................................. App-74
[F]
Faulty station occurs at certain transmission
speeds..........................................................15-18
Faulty stations cannot be detected .............15-18
Forced master switching........................... App-23
Forced master switching instruction result
................................................................... App-31
Forced master switching request
acknowledgement..................................... App-24
Forced master switching request complete
................................................................... App-24
Function list .....................................................3- 8
Functions.........................................................8- 1
Ind
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......