9 - 17 9 - 17
9. DEDICATED INSTRUCTIONS AND PROGRAMMING
(1) Functions
(a) Operation chart for the G(P).RIRCV instruction
Receive buffer
G(P).RIRCV
Programmable controller CPU
Command
Device memory
4)
Intelligent device station
Buffer memory
5)
RY
RX
RY
RX
1)
3)
Master module
2)
Master station
Specified station
1) Instructs the master module to read data from the buffer memory
specified in (S1)+2 and (S1)+3 of the station specified in (S1)+1.
2) The master module monitors the remote input (RX) specified in (S2)+1.
3) When the remote input (RX) specified in (S2)+1 turns ON from OFF,
the master module reads data from the buffer memory of the specified
station.
Read data are stored in the receive buffer of the master module.
4) The master module turns the remote output (RY) specified in (S2)+0
ON.
When the remote input specified in (S)+1 turns OFF from ON, the
remote output specified in (S2)+0 turns OFF.
5) Data read out from the specified station are stored in the device
specified in (D1) and subsequent devices, and a device specified in D2
turns ON.
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......