9 - 12 9 - 12
9. DEDICATED INSTRUCTIONS AND PROGRAMMING
(3) Functions
(a) Operation chart for the G(P).RIWT instruction
Master station
Specified station
Send buffer
G(P).RIWT
Programmable controller CPU
Command
Device memory
1)
4)
Buffer memory
Programmable controller CPU
Device memory
3)
2)
3)
2)
Master module
Local module
1) Stores the data to be written to the specified station in the send buffer of
the master module.
2) Writes the data specified by (S2) to the buffer memory specified by
(S1)+2 and (S1)+3 of the station specified by (S1)+1 or to the
programmable controller CPU device.
3) The specified station returns the write complete response to the master
station.
4) The device specified by (D) turns ON.
(b) The G(P).RIWT instruction can be executed to multiple local stations or
intelligent device stations simultaneously.
Note that concurrent execution of multiple instructions including other
dedicated instruction(s) (refer to Section 9.1) is not allowed to the same local
station or intelligent device station.
Create a program in which a flag remains on until the instruction is
completed.
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......