354
12 DATA USED FOR POSITIONING CONTROL
12.1 Types of Data
Checking positioning parameters
Positioning parameters are checked at the following timings.
• When PLC READY signal [Y0] output from the CPU module to the RD75 changes from off to on
• When the [Starting] button is clicked at "Positioning Test" of the engineering tool
Advanced positioning control is performed in combination with Major positioning control. For details on the
parameters required for Advanced positioning control, refer to the parameter settings of Major positioning
control.
Summary of Contents for MELSEC iQ-R RD75P4
Page 1: ...MELSEC iQ R Positioning Module User s Manual Application RD75P2 RD75P4 RD75D2 RD75D4 ...
Page 2: ......
Page 13: ...11 MEMO ...
Page 19: ...17 CONTENTS INDEX 588 REVISIONS 592 WARRANTY 593 TRADEMARKS 594 ...
Page 498: ...496 13 PROGRAMMING 13 2 List of Labels Used ...
Page 503: ...13 PROGRAMMING 13 4 Program Example 501 13 ...
Page 514: ...512 13 PROGRAMMING 13 4 Program Example Restart program Parameter data initialization program ...
Page 515: ...13 PROGRAMMING 13 4 Program Example 513 13 Flash ROM write program Error reset program ...
Page 516: ...514 13 PROGRAMMING 13 4 Program Example Stop program ...
Page 565: ...APPENDICES Appendix 4 Operation Examples of When the Remote Head Module Is Mounted 563 A ...
Page 597: ......