562
APPENDICES
Appendix 4 Operation Examples of When the Remote Head Module Is Mounted
Checking the network status
After setting parameters to the master station and the intelligent device station, check whether data link is normally performed
between the master station and the intelligent device station. Check the network status using the CC-Link IE Field Network
diagnostics of the engineering tool.
For how to perform the CC-Link IE Field Network diagnostics from the master station, refer to the following.
MELSEC iQ-R CC-Link IE Field Network User's Manual (Application)
Program examples
Write the programs to the CPU module on the master station.
Module label
For the program examples, the module labels of the CPU module and master/local module are used.
Global label
■
List of global labels
Define global labels as shown below:
Label name
Description
Device
RCPU.stSM.bAfter_RUN1_Scan_ON
ON for one scan after RUN
SM402
RCPU.stSM.bAfter_RUN1_Scan_OFF
OFF for one scan after RUN
SM403
GF11_1.bSts_DataLinkError
Data link error status of own station
SB0049
GF11_1.bnSts_DataLinkError_Station[1]
Data link status of each station (station number 1)
SW00B0.0
Summary of Contents for MELSEC iQ-R RD75P4
Page 1: ...MELSEC iQ R Positioning Module User s Manual Application RD75P2 RD75P4 RD75D2 RD75D4 ...
Page 2: ......
Page 13: ...11 MEMO ...
Page 19: ...17 CONTENTS INDEX 588 REVISIONS 592 WARRANTY 593 TRADEMARKS 594 ...
Page 498: ...496 13 PROGRAMMING 13 2 List of Labels Used ...
Page 503: ...13 PROGRAMMING 13 4 Program Example 501 13 ...
Page 514: ...512 13 PROGRAMMING 13 4 Program Example Restart program Parameter data initialization program ...
Page 515: ...13 PROGRAMMING 13 4 Program Example 513 13 Flash ROM write program Error reset program ...
Page 516: ...514 13 PROGRAMMING 13 4 Program Example Stop program ...
Page 565: ...APPENDICES Appendix 4 Operation Examples of When the Remote Head Module Is Mounted 563 A ...
Page 597: ......