
215015
200
Revision A
1008947
A
Figure 6.74: Ground Speed Lever
CAUTION
Check to be sure all bystanders have cleared the area.
21. Start the engine and press HEADER DOWN switch (A) on
the GSL to fully lower the header.
22. Stop the engine and remove key from ignition.
1000774
A
B
Figure 6.75: Header Drive Hoses and Harness
23. Connect header drive hoses (A) and electrical harness (B) to
header. Refer to the header operator
’
s manual.