
215015
192
Revision A
1008946
A
Figure 6.53: Ground Speed Lever
10. Press HEADER UP switch (A) to raise the header to
maximum height.
11. If one end of the header does
NOT
fully raise, rephase the
lift cylinders as follows:
a.
Press and hold the HEADER UP switch until both
cylinders stop moving.
b.
Continue to hold the switch for 3
–
4 seconds. Cylinders
are now phased.
NOTE:
It may be necessary to repeat this procedure if there is air in
the system.
1029827
A
B
Figure 6.54: Safety Prop
12. Engage the safety props on both lift cylinders as follows:
a.
Shut down the engine, and remove the key from the
ignition.
b.
Pull lever (A) and rotate towards the header to release
and lower safety prop (B) onto the lift cylinder.
c.
Repeat for opposite lift cylinder.