EN UG-020 Link 6 user guide r1.0
113
• 4 x M8 socket head cap screws, grade 12.9 steel
Note:
Torque: 20 N·m
Note:
An equivalent imperial 5/16 in screw with equal or better mechanical properties
and underhead contact patch can be used.
• 2 x 8 mm dowels
About this task
The arm is in a flat packaging pose to minimize the amount of space it takes in its packaging.
This packaging pose also eases installation.
Procedure
1.
Define the location and prepare the surface according to the mounting pattern drawing.
1 - Dowel hole feature for optional dowel pins; 2 - Front; 3 - Back
2.
Place the arm on the surface with the holes of the
lining up with the holes of the surface.
3.
Secure the base with 5 mm hex key according to the hardware requirement.
+1 514-277-3777
kinovarobotics.com
© 2022 Kinova inc. All rights reserved.
Summary of Contents for Link 6
Page 1: ...Link 6 user guide Optional gripper shown ...
Page 8: ......