19. For safe operation
WARNING
- 183 -
Fo
r s
afe
op
er
atio
n
(7) Set up the crane level
A leaning crane compromises stability and strength. This
reduces the effective lifting capacity and can cause the crane to
tip over. Use the level gauge to make sure the crane is level.
(8) Check the state of outrigger setting
If the outriggers are not set properly, the crane's lifting capacity
will be reduced and the crane may be caused to tip over. Before
starting work, check the following points with special care.
・
Outrigger stopper pins
・
Tires should be clear of the ground
・
Outrigger floats in contact with the ground
・
Crane level
(9)
Before beginning crane operation, lift the load off the ground to
gauge the working condition and confirm that the ground
supports the outriggers adequately. If an outrigger supervisor is
appointed to observe outriggers during operation, safety will be
enhanced.
(
10
)
Use of anchors is prohibited
If the outriggers or other parts are held down by anchor ropes to
lift the overload, the crane may be damaged by excessive loads
and an accident might result. Never use an anchor rope.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...