1. Part names and terms
- 3 -
・
Pick and carry operation
…………
Driving with the suspension cylinders locked and a lifting load held
(without
crane operation).
・
Boom angle
………………………
The angle between the boom center line and the horizontal.
The lifting capacity for jib use is based on the boom angle.
・
Jib offset angle
……………………
The angle between the boom center line and the jib center line.
・
Working radius
……………………
The horizontal displacement between the slewing center and the center line of
the hook. If the working radius changes so does the lifting capacity value
(
except
the lifting capacity for jib use
).
The value on the lifting capacity chart indicates the actual working radius under
load including deflection of the boom.
・
Hoisting direction
…………………
The direction of the boom top in the driving configuration is defined as the front
and the right, left and rear are determined accordingly.
The actual lifting capacity may vary depending on the hoisting direction, even if
all the other various crane parameters are identical, such as whether or not
outriggers are used (
stationary crane-on-rubber operation, pick and carry
operation).
The capacity will also vary depending on how far outriggers are extended in
each hoisting region.
NOTE
Refer to the separate ACS instruction manual for slewing position display on the ACS.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...