- 132 -
17. Drive operation devices
1)
Display of hydraulic oil temperature
Hydraulic oil temperature
39
℃
or lower (blue)
From 40
℃
to 90
℃
(green)
91
℃
or higher (red)
Temperature of 14
℃
or lower is "- - -
℃
."
・
When the PTO is "ON"
(during crane operation)
If the hydraulic oil temperature reaches 91
℃
or higher, the current operating oil temperature is displayed in red
and the hydraulic oil temperature indicator lamp lights.
2)
Display of torque converter oil temperature
Torque converter temperature
When the oil temperature inside the torque converter rises above
120
℃
, the torque converter trouble indicator lamp lights and the
warning buzzer sounds intermittently
(1 second intervals).
49
℃
or lower (blue)
From 50
℃
to 119
℃
(green)
120
℃
or higher (red)
Temperature of 14
℃
or lower is "- - -
℃
."
3)
Display of battery voltage
When the battery voltage drops, the display is changed to red.
Battery voltage
20V or lower
(red)
From 21V to 30V
(green)
31V or higher (blue)
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...