This section lists precautions you should observe when operating this crane.
・
Make sure you fully understand these points before you start operation and observe them to operate safely.
・
In this section, pictures which illustrate dangerous situations or working practices are marked with a large "
×
" .
・
The illustrations in this section are intended to attract attention and supplement the main text.
They do not give a full and detailed account of the content of the text.
・
Further precautions may be necessary due to the attachments in use or the conditions of the site.
・
Observe the safety regulations and laws of the country where the crane is used.
19-1 General precautions
(0099-0008-0E)
19-1-1 Precautions on working environment
(T218351-032-0E)
(1)
Always discuss the work plan with all those involved before
you start
Discuss the work plan thoroughly with the site supervisor
before you start work.
A full knowledge of what the job involves and a proper work
plan will ensure safety and increase your working efficiency.
(2) Check for the working position, roads and the presence of
obstructions
Finally before the operator starts work, he should check the
safety of the area with his own eyes.
(3)
No entry into the working area
People, objects etc. should be absolutely prohibited from
entering into the crane working area. Always be aware of your
surroundings while you work.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...