- 219 -
21. Crane operation devices
Cr
ane
op
er
ation
d
ev
ice
s
(12) Main winch high-speed lowering switch
(13)
Auxiliary winch high-speed lowering switch
When you set the winch high-speed lowering switch to the "ON"
position and move the winch lever to the lowering side while a
load is not suspended, the winch is lowered at a high speed.
・
Do not perform the winch lowering operation at high speed when lifting a load. Doing so is
dangerous.
・
Do not perform the winch lever suddenly. Doing so is dangerous.
(591A-0044-0E)
(14)
Drum rotation detector switch
The rotation of the winch drum which is selected by this switch is
detected during winch operation and a buzzer will sound to
indicate that the winch drum is rotating.
NOTE
The buzzer sound is the same for hoisting and lowering.
NOTE
The buzzer is emitted proportionally faster as the drum rotation
speed increases, until it eventually stops sounding once a
continuous sound is emitted.
(15) Main winch pedal
(16)
Auxiliary winch pedal
:
Depress the front part of the winch pedal to lower the winch.
:
Depress the rear part of the winch pedal to wind up the winch.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...