Preo
pe
ra
tio
na
l ch
eck
s/P
re-
driv
e ch
eck
s
26. Preoperational checks/Pre-drive checks
- 285 -
26. Preoperational checks/Pre-drive checks
(511A-0040-1E)
The p
urpose of preoperational checks and pre-drive checks is to ensure safe and efficient work.
Before you start driving machine or operating the crane, make the following items of inspections.
Record the crane condition you observe in the course of the checks in the "Inspection sheet".
If you discover any problems or points which require lubrication, refer to the sections on "Greasing" and "Inspection
and servicing of each part" for periodic inspection tasks.
・
The intervals stated in the inspection and servicing table are based on the elapsed time
indicated by the hour meter.
Follow both the passage of dates and of hours of operation and carry out each inspection item
when one of the times is reached, whichever occurs sooner.
・
If you discover any damage, breakdown or malfunction, repair it immediately. Do not leave it
for later and do not start work before it is repaired.
・
For the inspection and replacement methods for the engine, refer to the separate engine
manual.
・
The inspection intervals for this machine are based on standard operations and working
conditions.
Under severe conditions, the inspection and replacement intervals should be shortened
accordingly.
・
If any method or interval of inspection and servicing is unclear, contact your authorised KATO
dealer.
(541A-0259-0E)
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...