- 133 -
17. Drive operation devices
D
riv
e o
pe
ra
tio
n d
evi
ces
・
When the PTO is "OFF"
(for driving on roads)
When the battery voltage falls below the rated voltage
(
20V
)
, the current voltage is displayed in red, the battery
charge indicator lamp on the cluster meter panel starts to flash and the warning buzzer sounds. At the same time,
the battery voltage indicator lamp lights.
4) SCR cleaning cancel switch
Once the switch is pressed, cleaning is in the canceled status
shown in red and cleaning is not carried out.
By pressing this switch again, the cleaning canceled status is
canceled, and cleaning is carried out.
(3)
Two/four wheel drive switch
Use this switch to choose the driven wheels.
The axles 1 and 2 are driven.
1)
If the two/four wheel drive
(
4WD
)
switch lights in blue, the machine is in two-wheel drive mode. When you
press the switch in this mode, the confirmation buzzer "pip" will sound and the two/four wheel drive switch will
flash in green and blue
(mode shifting)
and light in green steadily, indicating that the machine is in four-wheel
drive mode.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...