WARNING
19. For safe operation
- 198 -
19-2-12 Pick and carry operation
(0099-0257-0E)
(1)
Strictly follow the cautionary instructions given in the operation
manual.
(2)
Attempt neither to load the crane to its full capacity nor to lift
up loads unnecessarily high. The lifting height should be kept to
such a level as the load is a short distance above the ground.
(3)
Select the "Pick and carry operation" as the outrigger status on
the ACS.
(4)
Apply the suspension level lock
(
with the suspension cylinders
set in the neutral position) and check that the suspension locked
indicator lamp comes to light. Then, drive the machine on a
level firm ground at a low speed.
(5)
Do not perform the steering operation while the suspension lock
is applied and the suspension cylinders are fully retracted.
Perform the steering operation only while the suspension level
lock is applied.
(6)
Arrange a guide at necessary points of the driving course.
(7) Remove the obstacles and the working personnel from the
driving course.
(8)
Never attempt to operate the crane during driving with an object
slung.
(9)
Driving with an object slung should be performed only on a
level firm ground at a speed of less than 2 km/h.
(
10
)
Check the tire inflation pressure.
If it is lower than the specified pressure
(
900 kPa
), charge air
before beginning with the work.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...