19. For safe operation
WARNING
- 187 -
Fo
r s
afe
op
er
atio
n
(13)
Arrange slings securely
If the slings are not fitted securely, the load can fall off or slip
out of the slings and fall down. Arrange slings securely with
attention to the following points.
・
The sling wire ropes or chains used to suspend the load from
the hook should be the right size and undamaged. Damaged
slings could break and drop the load. Arrange the slings so that
they do not interfere or tangle with each other.
・
The hook is fitted with a retainer to prevent the slings from
slipping out. Check that it works correctly. If not, there is the
risk that the slings could slip from the hook causing the load to
fall. So have it repaired or replaced before you proceed with
hoisting.
・
Place protectors of some soft material to protect the sling wire
ropes where they come into contact with corners of the
suspended load or anywhere they are prone to damage.
(14)
Crane up objects one by one
Attempting to crane up the plural number of objects at a time is
very dangerous because it makes difficult for the operator to
watch all objects evenly. Such an attempt can also cause uneven
loads to be applied to the boom, possibly resulting in damaged
boom. Avoid craning up two or more pieces of load at a time
even if the total mass does not exceed the rated capacity.
(15)
Use the crane only as intended
Attempts to draw out objects buried in the ground or to draw up
objects whose mass is not known can apply unexpected large
load on the various parts of the crane, possibly causing the crane
to be damaged or the machine to fall down. Examine and
discuss the mass of load and the working process with the
worksite manager before beginning with the work.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...