![Kato PREMIUM CITYRANGE CR-200RF Instruction Manual Download Page 218](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900218.webp)
19. For safe operation
WARNING
- 189 -
Fo
r s
afe
op
er
atio
n
(
20
)
Do not move the suspended load above people's heads
Never pass a suspended load or hook over the heads of other
workers as this endangers their safety.
(21) Beware of contact and collision with obstacles
When you hoist or slew the load or hook and the wire rope
becomes entangled with any obstacle, disentangle it carefully
without hoisting or slewing it further by force and then resume
hoisting.
Put the load back on the ground and check that the wire rope
wasn't damaged before hoisting the load any further.
(22) When an overload occurs during an operation
If you suddenly derrick or lower the boom, it makes the crane
much more prone to tipping over.
Unwind the winch to lower the load to the ground.
(23) Never hoist people
Using the crane to hoist or move people is forbidden.
A crane is nothing more than a machine for lifting objects and
must not be used to lift people on the hook or on top of a load.
Further observe the safety regulations and laws of the country
where the crane is used.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...