24. Crane operation
24-4-2 Extension and retraction of boom sections 4, 5 and 6
(T217321-032-0E)
Perform operations with boom sections 2 and 3 fully extended.
Extend: Push the lever forward while pressing the boom sections 4, 5 and 6 extension/retraction button.
Stop: Return the lever to the neutral position.
Retract: Pull the lever back while pressing the boom sections 4, 5 and 6 extension/retraction button.
(1)
Extending the boom sections 4, 5 and 6
1)
Confirm that the main and auxiliary hooks are lowered sufficiently below the boom.
2)
Fully extend boom sections 2 and 3.
3)
Tilt the boom extension/retraction lever in the direction of extending the boom while pressing the boom sections 4,
5 and 6 extension/retraction button.
NOTE
For shock reduction at the time of stopping, operate the boom at a slow extension speed after the boom is
extended to about 26.5m.
(2) Retracting boom sections 4, 5 and 6
1)
Confirm that the main and auxiliary hooks is not lowered more than necessary below the boom.
2)
Tilt the boom extension/retraction lever in the direction of retracting the boom while pressing the boom sections 4,
5 and 6 extension/retraction button.
3)
To retract boom sections 2 and 3 as well, confirm that boom sections 4, 5 and 6 are fully retracted, briefly move
the boom extension/retraction lever back to the neutral position and take your hand off from the boom sections 4,
5 and 6 extension/retraction button before retracting the boom sections 2 and 3.
NOTE
For shock reduction at the time of switching, operate the boom at a slow retraction speed after the boom is
retracted to about 18.0m.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...