19. For safe operation
WARNING
- 173 -
Fo
r s
afe
op
er
atio
n
(5)
Precautions on working in the public road
Position a guide in the road and erect fences etc. to ensure the
safety of passing vehicles and pedestrians.
Further observe the safety regulations and laws of the country
where the crane is used.
(6) Maintain a good work site and environment for the crane.
If people or other machines enter the working area, they could
cause collisions or personal injury.
Before you start work, always check that your working area is
free of people and obstructions. Keep the working area a no
entry zone by placing fences or posting a supervisor.
(7)
Precautions when working near power cables
If you are working close to power cables, you can receive a
shock even if the crane does not actually touch the cables.
Observe the following instructions strictly when you are
working in the vicinity of the power transmission lines.
1)
Measures for safety
・
Contact the managing company in advance and fit protective
devices such as tubular coverings and warning signs.
・
Arrange appropriate guides at the necessary places to have
them watch the progress of the works.
・
Keep a safe distance between the crane and the power cables.
Before you start work, the electricity company should be
consulted on the location and voltage of cables on the site and
the necessary isolation distance.
・
Allow nobody to come near around the crane when you are
working in the neighborhood of power transmission lines.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...