42
4-2-1 Assemble and remove moving head (except for 1
st
head)
2-3. Move moving head to the position that 8
th
needle is
active.
Tighten 4 screws on moving head. (see photo below)
Moving head
Rail support
Please confirm that there is no space at the arrow point on
above picture.
2-4. Set take-up lever to lever crank
2-5. Please needle bar of 8
th
needle down until needle driver
catches needle bar boss. Then turn upper shaft to needle
down and check that needle is center of needle hole on
needle plate. If needle position is not center of needle hole,
please move moving head right or left to fit needle
position.
Please refer to [ 4-2-5 Adjustment of needle position (left
and right) ].
2-6. Tighten 8 screws on moving head. (See photo below)
< Note >
Gap between Moving head and Fasten Block
should be
2.5mm
.
Summary of Contents for HCR3-1502
Page 1: ... Maintenance Manual for Embroidery Machine HCR3E SERIES Version 1 2 HappyJapan Inc ...
Page 104: ...105 4 7 3 Adjustment of timing detecting unit 8 Finally put the cover back on ...
Page 107: ...107 ...
Page 172: ...172 E7 Electric system diagram E7 1 Pulse motor driver PMD wiring ...
Page 173: ...173 E7 2 Pulse motor driver PMD setup ...
Page 174: ...174 E7 3 Inverter wiring ...
Page 175: ...175 E7 4 Electrical connection diagram ...
Page 176: ...176 ...
Page 177: ...177 ...
Page 178: ...178 E7 5 List of electrical connection diagram ...
Page 179: ...179 ...
Page 180: ...180 E7 6 Explanation of function clrcuit board HCD8122 LCD CE MX Board Ass y ...
Page 181: ...181 HCD8116 TP SW Circuit Board Ass y CN No Function CN1 Switch output LED input ...