62
4-2-11 Exchange of take-up lever
1. Remove moving head.
Please refer to [ 4-2-1, 4-2-2 Assemble and remove moving
Head ].
2. Loosen screw on take-up lever shaft. (Fixing screw 2 pcs)
3. Remove the E-ring.
4. Please do not miss “Plastic thrust washer” between E-ring
and Take up lever.
Remove plastic thrust washer. (1 pcs)
5. Remove the take up lever shaft first then remove the take-
up lever.
6. Remove plastic washer.
Summary of Contents for HCR3-1502
Page 1: ... Maintenance Manual for Embroidery Machine HCR3E SERIES Version 1 2 HappyJapan Inc ...
Page 104: ...105 4 7 3 Adjustment of timing detecting unit 8 Finally put the cover back on ...
Page 107: ...107 ...
Page 172: ...172 E7 Electric system diagram E7 1 Pulse motor driver PMD wiring ...
Page 173: ...173 E7 2 Pulse motor driver PMD setup ...
Page 174: ...174 E7 3 Inverter wiring ...
Page 175: ...175 E7 4 Electrical connection diagram ...
Page 176: ...176 ...
Page 177: ...177 ...
Page 178: ...178 E7 5 List of electrical connection diagram ...
Page 179: ...179 ...
Page 180: ...180 E7 6 Explanation of function clrcuit board HCD8122 LCD CE MX Board Ass y ...
Page 181: ...181 HCD8116 TP SW Circuit Board Ass y CN No Function CN1 Switch output LED input ...