28 • Site Manager User Manual
026-1012 Rev 3 06-DEC-2011
Schedules can also be based on an interval (select
the Interval Based option):
Enter the Number of times to repeat or leave
blank to run indefinitely.
Note that there will be no option for interval based
schedules if Setpoint Broadcast is selected from the
Type drop-down menu.
Schedules can also be Calendar-based:
• Months: Users will have the option to multi-select
any month/months from January to December. This
selection is only visible for Days of Week and Days
of Month calendar schedules.
• Days of the Week: Multi-select any day/days from
Sunday to Saturday. This selection is only visible for
Days of Week calendar schedules.
• Hours and Minutes:
Hours: multi-select any hour/hours from 0 to 23.
Minutes: multi-select any minute/minutes from 0 to
55 in 5 minute increments.
Or select the All button instead of manually clicking
on each option at the end of each selection.
Clear any selections by clicking on the Clear but-
ton.
3.2.4.2. User Schedules
Scheduling Setpoint Broadcast
When store hours change or special events occur,
scheduling a Setpoint Broadcast can send data to mul-
tiple groups, sites, and/or multiple controllers at one
site, and provides the ability to send setpoint and pa-
rameter information across a single enterprise.
To schedule Setpoint Broadcast, refer to Section
3.3.2., Setpoint Broadcast.
Scheduling Retrieve Logs
Retrieving logs shows a historical view of inputs
and outputs of the applications you choose retrieve
logs on, which creates a history of records of the in-
puts and outputs for that application.
For scheduling Log Retrievals, enter a name and
choose whether the log retrieval should be run now or
on a schedule. Select the type of Schedule (one-time
only, at intervals, or calendar-based).
Scheduling Retrieve Logs From List
One or more appropriate selection of lists can be
chosen when the Retrieve Logs From List is selected.
Only the points with logs that are included in the pre-
viously made list will be retrieved.
Click Run Now > Go to run the activity immedi-
ately or save the schedule configuration to be run later
on a schedule (Run On Schedule).
Figure 3-37 - Example of a Scheduled Activity (Interval Based)
Figure 3-38 - Example of a Scheduled Activity (Calendar Based)
Figure 3-39 - Scheduling Retrieve Logs
Summary of Contents for Site Manager
Page 1: ...026 1012 Rev 3 06 DEC 2011 Site Manager User Manual ...
Page 2: ......
Page 4: ......
Page 124: ......
Page 129: ......