Section 04
ENGINE
Subsection 03
(REMOVAL AND INSTALLATION)
04-03-7
Engine Support Screws
Apply Loctite 242 (blue) on screw threads.
Torque engine support screws to 25 N•m (18 lbf•ft)
when procedure is completed.
717 ENGINE
1. Torque to 25 N•m (18 lbf•ft)
FRONT ENGINE SUPPORT — 787 AND 947 ENGINES
1. Torque to 25 N•m (18 lbf•ft)
REAR ENGINE SUPPORT — 787 AND 947 ENGINES
1. Torque to 25 N•m (18 lbf•ft)
Final Inspection
Check throttle cable condition and lubricate cable
with BOMBARDIER LUBE lubricant.
After its installation, properly adjust and bleed oil
injection pump as specified in OIL INJECTION
PUMP 07-03.
Check hose condition and pressure test fuel sys-
tem, refer to FUEL CIRCUIT 06-02.
Verify all electrical connections.
Run engine and ensure there is no leakage.
F02D0KA
1
Loctite
242
1
Loctite
242
Loctite
242
1
F06D35A
1
;
WARNING
Whenever doing any type of repair on water-
craft or if any components of the fuel system
are disconnected, a pressure test must be
done before starting engine.
-
CAUTION
If watercraft is out of water, engine must be
cooled using the flush kit.
F06D36A
1
Summary of Contents for SEA-DOO GS 5626 1998
Page 1: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 408: ......
Page 409: ......
Page 410: ......
Page 411: ......
Page 412: ......
Page 413: ......
Page 414: ......
Page 415: ......
Page 416: ......
Page 417: ......
Page 418: ......
Page 419: ......
Page 420: ......
Page 421: ......
Page 422: ......
Page 423: ......
Page 424: ......
Page 425: ......
Page 426: ......