Section 10
STEERING SYSTEM
Subsection 04
(GS, GSX LIMITED, GTI AND GTX LIMITED)
10-04-5
1,21, Grip and Grip Insert
When installing the grip insert
no. 21
in the han-
dlebar
no. 22
, ensure that its notch is properly in-
serted in the hole beneath the handlebar.
Install grip
no. 1
on handlebar
no. 22
matching it
to the hex form on the grip insert.
Install flat washer
no. 23
and screw
no. 3
.
Torque screw to 13 N•m (10 lbf•ft).
Install cap
no. 2
.
1. Grip insert
2. Grip
3. Flat washer
4. Screw. Torque to 13 N•m (10 lbf•ft)
5. Cap
15,16, Steering Stem Arm and Support
Position steering stem arm and support onto
steering stem.
1. Keyways
2. Integrated flat key
Replace lock nuts
no. 18
by new ones.
Torque bolts
no. 17
of steering stem arm to
6 N•m (53 lbf•
in
).
19, Ball Joint
Secure the steering cable ball joint
no. 19
to the
nozzle as per following illustrations.
GSX Limited and GTX Limited
TYPICAL
1. Ball joint on top of steering arm
2. Torque nut to 7 N•m (62 lbf•
in
)
-
CAUTION
Ensure to install flat washer otherwise screw
will damage grip end.
◆
WARNING
Make sure the integrated flat keys of the
steering stem arm and support are properly
seated in steering stem keyways. Steering
stem arm must be locked in place before
torquing the bolts.
F01K1PA
1
2
3
4
5
-
CAUTION
Ensure the ball joint is parallel (± 5°) to the
nozzle arm.
F07K09A
2
1
2
F06K01A
1
2
Summary of Contents for SEA-DOO GS 5626 1998
Page 1: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 408: ......
Page 409: ......
Page 410: ......
Page 411: ......
Page 412: ......
Page 413: ......
Page 414: ......
Page 415: ......
Page 416: ......
Page 417: ......
Page 418: ......
Page 419: ......
Page 420: ......
Page 421: ......
Page 422: ......
Page 423: ......
Page 424: ......
Page 425: ......
Page 426: ......