Section 08
ELECTRICAL SYSTEM
Subsection 04
(STARTING SYSTEM)
08-04-11
Step
: Retaining brush holder with a screwdriver
Step
: Align here
Align end frame notch with brush holder notch/
yoke protrusion.
947 Engine
Install new O-rings and gaskets.
Insert thrust washer
no. 7
onto armature shaft
with the non-metallic surface facing the end cover.
1. Non-metallic surface on this side
Install the 3 washers
no. 8
and
no. 9
onto arma-
ture shaft, with the thicker one in the middle.
1. Thick washer in the middle
When installing end covers
no. 3
and
no. 6
to
yoke, align index marks.
Apply Loctite 271 (red) on through bolts
no. 5
and
torque to 6 N•m (53 lbf•
in
).
STARTER INSTALLATION
Installation is essentially the reverse of removal
procedure. However, pay particular attention to
the following.
Make sure that starter and engine mating surfac-
es are free of debris. Serious trouble may arise if
starter is not properly aligned.
717 and 787 Engines
13,16, Screw
Apply Loctite 242 (blue) on threads and torque
starter screws to 22 N•m (16 lbf•ft).
17, Nut
Connect the RED positive cable to the starter and
torque nut to 6 N•m (53 lbf•
in
). Apply dielectric
grease on terminal and nut.
-
CAUTION
Make sure end frame fits perfectly on yoke.
F01H0UA
2
1
1
2
F06H1HA
1
F06H1NA
1
Summary of Contents for SEA-DOO GS 5626 1998
Page 1: ......
Page 405: ......
Page 406: ......
Page 407: ......
Page 408: ......
Page 409: ......
Page 410: ......
Page 411: ......
Page 412: ......
Page 413: ......
Page 414: ......
Page 415: ......
Page 416: ......
Page 417: ......
Page 418: ......
Page 419: ......
Page 420: ......
Page 421: ......
Page 422: ......
Page 423: ......
Page 424: ......
Page 425: ......
Page 426: ......