Section 18
Station communication
18.1
Communication protocols
Each IED is provided with a communication interface, enabling it to connect to one or
many substation level systems or equipment, either on the Substation Automation (SA)
bus or Substation Monitoring (SM) bus.
Available communication protocols are:
•
IEC 61850-8-1 communication protocol
•
IEC 61850-9-2LE communication protocol
•
LON communication protocol
•
SPA or IEC 60870-5-103 communication protocol
•
DNP3.0 communication protocol
•
C37.118 communication protocol
Several protocols can be combined in the same IED.
18.2
Communication protocol diagnostics
Status of the protocols can be viewed in the LHMI under
Main menu/Diagnostics/IED
status/Protocol diagnostics.
The diagnostic values are:
Diagnostic value
Description
Off
Protocol is turned off
Error
An error has occured, refer to event list for more
information
Warning
Configuration inconsistency. Unable to locate data
point.
Ready
Protocol is ready
1MRK 511 365-UUS A
Section 18
Station communication
Phasor measurement unit RES670 2.1 ANSI
599
Technical manual
Summary of Contents for Relion 670 Series RES670
Page 1: ...Relion 670 series Phasor measurement unit RES670 2 1 ANSI Technical manual ...
Page 2: ......
Page 36: ...30 ...
Page 76: ...70 ...
Page 106: ...100 ...
Page 150: ...144 ...
Page 274: ...268 ...
Page 326: ...320 ...
Page 356: ...350 ...
Page 382: ...376 ...
Page 416: ...410 ...
Page 590: ...584 ...
Page 604: ...598 ...
Page 694: ...688 ...
Page 756: ...750 ...
Page 834: ...828 ...
Page 836: ...830 ...
Page 876: ...870 ...
Page 886: ...880 ...
Page 887: ...881 ...