Smart PSU
7
SPCP355.300 Smart PSU
59
Vanderbilt
Installation & Configuration Manual
A6V10276959
01.05.2016
Number Description
1
Battery
2
Battery strap
3
Fixing holes
4
Strap holes
5
Battery leads
6
Battery temperature leads
7
PSU\Expander
8
Mounting positions for additional expanders.
It is recommended that two batteries are used. These batteries must be of the
same type and capacity.
1. Install the batteries in the battery compartment.
Содержание SPCK620
Страница 1: ...A6V10276959 Vanderbilt 01 05 2016 SPC42xx 43xx 52xx 53xx 63xx Installation Configuration Manual 3 6 ...
Страница 364: ...23 Appendix ATP Category Timings 364 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...
Страница 365: ...Appendix 23 ATP Category Timings 365 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...
Страница 366: ...23 Appendix ATP Category Timings 366 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...
Страница 367: ...Appendix 23 ATP Category Timings 367 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...