7
Smart PSU
SPCP355.300 Smart PSU
64
Vanderbilt
Installation & Configuration Manual
A6V10276959
01.05.2016
To comply with NF & A2P installation regulations, this enclosure must be sealed
by affixing the accompanying Tamper Label after installation.
SPC products listed have been tested according to NF324 - H58, with reference to
RTC50131-6 and RTC50131-3 and current EN certifications, see Compliance with
Product Type
Configuration
Standard
Logo
SPC6350.320 +
SPCP355.300
(Cert. XXXXXXXXXX)
60h, unmonitored
NF Grade 3,
Class 1
SPC5350.320 +
SPCP355.300
(Cert. XXXXXXXXXX)
60h, unmonitored
SPC6330.320 +
SPCP333.300
(Cert. 1232200003)
60h, unmonitored
NF Grade 3,
Class 1
SPC5330.320 +
SPCP333.300
(Cert. 1232200003)
60h, unmonitored
7.1.5
PSU LED Status
The following table lists the Smart PSU LED status information:
LED
MAINS BATT 1 & 2 FUSE
LIMIT
STATUS
COLOUR
Green
Green
Red
Red
Green
Condition
Normal
On
On
Off
Off
On
Mains OK, battery charging On
Flash
On
Mains Fail, Battery OK
Off
On
On
Mains OK, battery faulty or
not present
On
Off
On
Mains OK, battery faulty,
not present, or in deep
discharge protection mode
All LEDs Off.
Fuse Fail
On
On
Total Load Current
exceeded
On
On
PSU switcher failure
Off
Flash
Содержание SPCK620
Страница 1: ...A6V10276959 Vanderbilt 01 05 2016 SPC42xx 43xx 52xx 53xx 63xx Installation Configuration Manual 3 6 ...
Страница 364: ...23 Appendix ATP Category Timings 364 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...
Страница 365: ...Appendix 23 ATP Category Timings 365 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...
Страница 366: ...23 Appendix ATP Category Timings 366 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...
Страница 367: ...Appendix 23 ATP Category Timings 367 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...