Directives and standards
3
EU directives
29
Vanderbilt
Installation & Configuration Manual
A6V10276959
01.05.2016
Hardware Fault reporting — in Options, you must select the E
Reporting (10s) option from the Watchdog Output Mode drop-down list.
Note: Hardware faults are not reported if the Engineer is logged in to the
system.
Hardware
VDS compliance requires the following:
A G5 housing with Front tamper implemented as a minimum requirement.
Keypads do not show status information if the system is armed.
The number of supported zones is as follows:
– 512 zones in ring configuration
– 128 zones per X-Bus in multi-drop (spur) configuration
The following end of line resistance combinations do not comply with VdS
standards:
– 1k, 470 ohm
– 1k, 1k, 6k6 ohm
3.1.7
Compliance with NF and A2P approvals
Address of Certifying Body
CNPP Cert
Pôle Européen de Sécurité - Vernon
Route de la Chapelle Réanville
CD 64 - CS 22265
F-27950 SAINT MARCEL
www.cnpp.com
AFNOR Certification
11 rue François de Pressensé
93571 Saint Denis La Plaine Cedex
www.marque-nf.com
To comply with NF & A2P installation regulations, this enclosure must be sealed
by affixing the accompanying Tamper Label after installation.
Содержание SPCK620
Страница 1: ...A6V10276959 Vanderbilt 01 05 2016 SPC42xx 43xx 52xx 53xx 63xx Installation Configuration Manual 3 6 ...
Страница 364: ...23 Appendix ATP Category Timings 364 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...
Страница 365: ...Appendix 23 ATP Category Timings 365 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...
Страница 366: ...23 Appendix ATP Category Timings 366 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...
Страница 367: ...Appendix 23 ATP Category Timings 367 Vanderbilt Installation Configuration Manual A6V10276959 01 05 2016 ...