1) Remove B terminal inner nut (1) and insulator (2).
2) Remove rear end cover (3).
3
1
2
3) Remove 2 brush holder screws (1) and pull out brush holder as-
sembly (2).
4) Remove 3 IC regulator screws (3) and IC regulator (4).
2
3
4
1
5) Remove brush holder cover (1) from brush holder (2).
1
2
6) Remove rectifier holder (1).
1
7) Hold shaft by using hexagonal box wrench (1) and remove
pulley nut, and then pull out pulley (2).
CAUTION:
To hold shaft, use hexagonal box. Duodecimal box
may cause slipping and consequential shaft or
tool damage.
Do not attempt to hold pulley by using vise or pipe
wrench so as not to distort it.
1
2
CHARGING SYSTEM
6H-13
Содержание RA410
Страница 150: ...2 Stabilizer bar 3 Steering knuckle 5 Suspension control arm 8 Tie rod 9 Brake disc 2 9 3 5 8 3D 2 FRONT SUSPENSION...
Страница 262: ...ENGINE MECHANICAL 6A4 3...
Страница 388: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 23 Blank...
Страница 392: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 27 Fig for Step 3 2 3 1...
Страница 399: ...6E1 34 ENGINE AND EMISSION CONTROL SYSTEM Fig for Step 2...
Страница 552: ...AUTOMATIC TRANSMISSION 7B 25...
Страница 553: ...7B 26 AUTOMATIC TRANSMISSION...
Страница 663: ...BODY SERVICE 9 21 BUMPERS Front bumper Rear bumper...
Страница 761: ...Prepared by Overseas Service Department 1st Ed May 1998 Printed in Japan Printing May 1999 610...