
Use of machine
223
Giga-Vitesse CFS 3602 - 4402, Giga-Vitesse CFS 3602 DO - 4402 DO 03.18
6.
Let the tractor's p.t.o. shaft smoothly start to run such that the beaters are able to loosen
themselves.
The beaters start to run and after a short delay, the transport floor automatically starts.
Switch the tractor's p.t.o. shaft immediately off if the slip clutch responds.
Press the
key to switch the transport floor feed off.
Press the
key once to reverse the feed direction of the transport floor for 3
seconds. Thus, the pressing power which the loaded material applies to the beaters, and
the starting torque for loosening the beaters are reduced.
Press the
key again.
The transport floor automatically switches to standby mode and the "Feed On" symbol is
flashing on the control set.
Switch the tractor's p.t.o. shaft on.
Let the tractor's p.t.o. shaft smoothly start to run such that the beaters are able to loosen
themselves.
The beaters start to run and after a short delay, the transport floor automatically starts.
7.
Start to move and select the travelling speed of the tractor according to the height of the desired
discharged material stack.
Switch the p.t.o. shaft off before changing the lane on the clamp silo.
The beaters and the transport floor stop. The transport floor automatically switches to
standby mode and the "Feed on" symbol is flashing on the control set if the transport floor
is not separately switched off via the
key.
Change the lane.
Switch the tractor's p.t.o. shaft on.
Let the tractor's p.t.o. shaft smoothly start to run such that the beaters are able to loosen
themselves.
The beaters start to run and after a short delay, the transport floor automatically starts.
•
During discharge, the feed rate of the transport floor can be
changed via the keys
and
or
.
For changing the feed rate, press the
key once and the
or
key quickly in succession several times if
necessary.
•
Press the
key to lower the folding drawbar during
discharge on the clamp silo.
8.
Press the
key once to double the feed rate of the transport floor for complete emptying.
Содержание Giga-Vitesse CFS 3602
Страница 2: ......
Страница 4: ...Bad Laer den 26 03 2018 Dipl Kfm W Strautmann Managing Director...
Страница 304: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 304 11 Circuit diagrams...
Страница 305: ...Circuit diagrams 305 Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 11 1 Hydraulic circuit diagram...
Страница 306: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 306 Fig 174...
Страница 309: ...Circuit diagrams 309 Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18...
Страница 310: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 310...
Страница 313: ...Circuit diagrams 313 Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18...
Страница 314: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 314...
Страница 317: ...Circuit diagrams 317 Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18...
Страница 318: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 318...
Страница 320: ...Circuit diagrams Giga Vitesse CFS 3602 4402 Giga Vitesse CFS 3602 DO 4402 DO 03 18 320...
Страница 326: ......