2.5.4
Connecting drills
If a drill is connected to the delivery line for the placing boom, it must
not place any further strain on the placing boom. The placing boom
must be connected to the drill in such a way that the placing boom
does not require adjustment. There should be 1-2 delivery hoses be‐
tween the placing boom and the drill; these must be secured so that
they cannot move in an uncontrolled manner. If the drill is moved on
the construction site, the placing boom must not be connected.
2.5.5
Procedure in storms
Return the placing boom to the driving position or rest position in the
event of storms or bad weather.
● Placing booms with a vertical reach of 42 m or more must only be
operated in winds of up to wind force 7 (wind speed 51 km/h).
● Placing booms with a vertical reach of less than 42 m may only be
operated in winds of up to wind force 8 (wind speed 74 km/h).
The definitive wind speed is measured at the height of the boom tip.
Wind speeds in accordance with the Beaufort scale are average wind
speeds measured over a period of 10 minutes. Higher speed gusts of
wind may occur briefly during the measuring period.
Higher wind speeds jeopardise the stability and safety of structural el‐
ements. There is a risk of lightning strike in a thunderstorm.
Lightning strikes pose a risk of death. The machine and the surround‐
ing area will be charged with electricity. Earthing the machine does
not reduce this risk. For this reason, you should fold in the placing
boom if there is a risk of lightning strike.
Tower cranes on construction sites generally have wind speed meas‐
uring equipment, enabling you to find out the wind speed at any time.
If no wind speed measuring equipment is available, you can ask the
nearest meteorological office what the wind speed is, or estimate the
wind speed using the following rule of thumb:
● In winds of force 7 and greater, green leaves break from the trees
and there is perceptible resistance when walking against the wind.
● In winds of force 8 and greater, small branches break from trees
and walking outside is significantly impeded.
Safety Manual
Concrete delivery and placing machines
01/2018 Rev16 EN
45
Содержание SP 1800-D
Страница 1: ...Original operating instructions Stationary concrete pump EN SP 1800 D SP 2800 D...
Страница 8: ...005 007 00 EN Blank page...
Страница 26: ...1 4 6 004 997 02 EN Blank page...
Страница 30: ...1 4 1 4 002 410 15 EN Blank page...
Страница 46: ...1 7 10 005 142 08 EN Fig 21 turn main switch for starter batteries to the right...
Страница 48: ...005 016 00 EN Blank page...
Страница 49: ...Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN...
Страница 56: ...8 01 2018 Rev16 EN...
Страница 57: ...1 Terms definitions requirements Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN 9...
Страница 58: ...10 01 2018 Rev16 EN...
Страница 78: ...30 01 2018 Rev16 EN...
Страница 104: ...56 01 2018 Rev16 EN...
Страница 105: ...3 Maintenance and special work Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN 57...
Страница 106: ...58 01 2018 Rev16 EN...
Страница 120: ...72 01 2018 Rev16 EN...
Страница 121: ......
Страница 122: ......
Страница 123: ...005 017 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 124: ...005 017 00 EN Blank page...
Страница 126: ...3 2 1 001 855 06 EN Blank page...
Страница 129: ...3 3 3 001 462 06 EN Fig 1...
Страница 130: ...3 3 4 001 462 06 EN Blank page...
Страница 139: ...3 10 5 005 144 04 EN Fig 10 Fig 11 locked release Fig 12 Fig 13...
Страница 150: ...3 20 6 004 551 01 EN Blank page...
Страница 164: ...3 22 14 003 336 15 EN Blank page...
Страница 174: ...3 34 4 004 546 02 EN Blank page...
Страница 180: ...3 37 4 004 910 01 EN Blank page...
Страница 186: ...3 38 6 005 148 02 EN Blank page...
Страница 220: ...3 60 12 002 368 08 EN Blank page...
Страница 224: ...3 80 2 001 156 04 EN Blank page...
Страница 225: ...005 018 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 226: ...005 018 00 EN Blank page...
Страница 232: ...4 3 2 002 878 14 EN Blank page...
Страница 244: ...4 4 12 000 869 22 EN Blank page...
Страница 264: ...4 5 20 000 024 14 EN Blank page...
Страница 268: ...4 10 2 004 073 01 EN Blank page...
Страница 273: ...4 11 001 915 00 EN MAINTENANCE REPORT Maintenance A B C D E F G please enter Date Signature Notes...
Страница 274: ...4 11 001 915 00 EN Blank page...
Страница 275: ...4 11 001 915 00 EN MAINTENANCE REPORT Maintenance A B C D E F G please enter Date Signature Notes...
Страница 276: ...4 11 001 915 00 EN Blank page...
Страница 284: ...4 20 8 004 553 03 EN Blank page...
Страница 292: ...4 30 4 004 491 01 EN Blank page...
Страница 300: ...4 40 8 001 193 16 EN Blank page...
Страница 306: ...4 42 6 004 076 01 EN Blank page...
Страница 324: ...4 44 18 002 514 16 EN Blank page...
Страница 330: ...4 55 6 002 940 02 EN Blank page...
Страница 332: ...4 57 2 004 054 00 EN Blank page...
Страница 340: ...4 60 8 005 151 04 EN Blank page...
Страница 346: ...4 70 2 001 918 05 EN Blank page...
Страница 347: ...005 019 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 348: ...005 019 00 EN Blank page...
Страница 357: ......
Страница 358: ......
Страница 360: ......
Страница 363: ......
Страница 365: ...005 020 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 366: ...005 020 00 EN Blank page...
Страница 372: ...6 8 6 002 720 04 EN Blank page...
Страница 373: ...005 021 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 374: ...005 021 00 EN Blank page...
Страница 390: ...Always Ready 7 30 10 005 023 01 Blank page...