Do not carry out more than one movement at a time. If a movement is
stopped, the entire volume of fluid is available for the remaining
movements, and can increase their speeds. Depending on the de‐
sign, it may be the case that carrying out several movements at once
(as opposed to carrying out a single movement at maximum speed at
any one time) does not bring any advantage in terms of time. Carry‐
ing out several movements at once requires an increased level of at‐
tentiveness.
Lock all supports mechanically, if this is provided for in the design.
Close all shut-off valves in the support hydraulics. Leaks can cause
the supports to sink on one side.
The machine must be made level in all directions. Provided the manu‐
facturer does not state otherwise, the maximum permissible deviation
from the horizontal is 3 °. Greater deviations from the horizontal over‐
load the slewing gear for the placing boom as well as its overall sup‐
port structure, jeopardising the stability of the machine.
Check stability regularly during operation. The elastic distortions to
the machine frame occasionally occurring under extreme positions of
the placing boom (one support foot lifts from the ground) must be
compensated for by resetting the support cylinders until all support
feet are firmly placed on the ground.
2.4.5
Driving
When preparing the machine for driving, you must perform the follow‐
ing tasks in particular:
● The placing boom must be folded in fully and positioned on the
placing boom support provided.
● The support legs and support feet must be fully retracted and se‐
cured.
● Raised or locked axles must be lowered and released.
Safety Manual
Concrete delivery and placing machines
01/2018 Rev16 EN
39
Содержание SP 1800-D
Страница 1: ...Original operating instructions Stationary concrete pump EN SP 1800 D SP 2800 D...
Страница 8: ...005 007 00 EN Blank page...
Страница 26: ...1 4 6 004 997 02 EN Blank page...
Страница 30: ...1 4 1 4 002 410 15 EN Blank page...
Страница 46: ...1 7 10 005 142 08 EN Fig 21 turn main switch for starter batteries to the right...
Страница 48: ...005 016 00 EN Blank page...
Страница 49: ...Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN...
Страница 56: ...8 01 2018 Rev16 EN...
Страница 57: ...1 Terms definitions requirements Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN 9...
Страница 58: ...10 01 2018 Rev16 EN...
Страница 78: ...30 01 2018 Rev16 EN...
Страница 104: ...56 01 2018 Rev16 EN...
Страница 105: ...3 Maintenance and special work Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN 57...
Страница 106: ...58 01 2018 Rev16 EN...
Страница 120: ...72 01 2018 Rev16 EN...
Страница 121: ......
Страница 122: ......
Страница 123: ...005 017 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 124: ...005 017 00 EN Blank page...
Страница 126: ...3 2 1 001 855 06 EN Blank page...
Страница 129: ...3 3 3 001 462 06 EN Fig 1...
Страница 130: ...3 3 4 001 462 06 EN Blank page...
Страница 139: ...3 10 5 005 144 04 EN Fig 10 Fig 11 locked release Fig 12 Fig 13...
Страница 150: ...3 20 6 004 551 01 EN Blank page...
Страница 164: ...3 22 14 003 336 15 EN Blank page...
Страница 174: ...3 34 4 004 546 02 EN Blank page...
Страница 180: ...3 37 4 004 910 01 EN Blank page...
Страница 186: ...3 38 6 005 148 02 EN Blank page...
Страница 220: ...3 60 12 002 368 08 EN Blank page...
Страница 224: ...3 80 2 001 156 04 EN Blank page...
Страница 225: ...005 018 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 226: ...005 018 00 EN Blank page...
Страница 232: ...4 3 2 002 878 14 EN Blank page...
Страница 244: ...4 4 12 000 869 22 EN Blank page...
Страница 264: ...4 5 20 000 024 14 EN Blank page...
Страница 268: ...4 10 2 004 073 01 EN Blank page...
Страница 273: ...4 11 001 915 00 EN MAINTENANCE REPORT Maintenance A B C D E F G please enter Date Signature Notes...
Страница 274: ...4 11 001 915 00 EN Blank page...
Страница 275: ...4 11 001 915 00 EN MAINTENANCE REPORT Maintenance A B C D E F G please enter Date Signature Notes...
Страница 276: ...4 11 001 915 00 EN Blank page...
Страница 284: ...4 20 8 004 553 03 EN Blank page...
Страница 292: ...4 30 4 004 491 01 EN Blank page...
Страница 300: ...4 40 8 001 193 16 EN Blank page...
Страница 306: ...4 42 6 004 076 01 EN Blank page...
Страница 324: ...4 44 18 002 514 16 EN Blank page...
Страница 330: ...4 55 6 002 940 02 EN Blank page...
Страница 332: ...4 57 2 004 054 00 EN Blank page...
Страница 340: ...4 60 8 005 151 04 EN Blank page...
Страница 346: ...4 70 2 001 918 05 EN Blank page...
Страница 347: ...005 019 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 348: ...005 019 00 EN Blank page...
Страница 357: ......
Страница 358: ......
Страница 360: ......
Страница 363: ......
Страница 365: ...005 020 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 366: ...005 020 00 EN Blank page...
Страница 372: ...6 8 6 002 720 04 EN Blank page...
Страница 373: ...005 021 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 374: ...005 021 00 EN Blank page...
Страница 390: ...Always Ready 7 30 10 005 023 01 Blank page...