2.5
Placing booms
2.5.1
Unfold placing boom
Only raise a mobile placing boom from the driving position once the
machine has been supported in accordance with the Operating In‐
structions. Stationary placing booms may only be raised after the
proper set-up has been checked by a subject expert.
Only raise the placing boom in the sequence described in the Operat‐
ing Instructions. The correct sequence depends on the “Folding sys‐
tem” (roll-and-fold system, Z fold system, etc.).
Do not carry out more than one movement at a time. If a movement is
stopped, the entire volume of fluid is available for the remaining
movements, and can increase their speeds. Depending on the de‐
sign, it may be the case that carrying out several movements at once
(as opposed to carrying out a single movement at maximum speed at
any one time) does not bring any advantage in terms of time. Carry‐
ing out several movements at once requires an increased level of at‐
tentiveness.
The range of a radio remote control is long enough for the machine to
receive control commands (e.g. from a great distance, from inside en‐
closed spaces) even without visual contact. If there is no visual con‐
tact, for example, because you are changing workplace, you must
switch off the remote control. If there is no visual contact, for exam‐
ple, because the construction site is unclear, signallers MUST be
used, and must remain in contact with the machine operator using
suitable means, and have visual contact with the site of concrete
placement, work areas and danger zones, and the machine.
Always ask the site management to provide you with an assistant to
act as a signaller. Agree clear hand signals or other signals with the
signaller so that you can communicate with each other. You should
position the signaller such that he can always observe the whole of
the placing boom. Your primary duty as the machine operator is to
observe the site of concrete placement.
Only slew the placing boom over persons when the delivery line and
end hose are empty. There is a risk of concrete falling out of the end
hose.
Safety Manual
Concrete delivery and placing machines
42
01/2018 Rev16 EN
Содержание SP 1800-D
Страница 1: ...Original operating instructions Stationary concrete pump EN SP 1800 D SP 2800 D...
Страница 8: ...005 007 00 EN Blank page...
Страница 26: ...1 4 6 004 997 02 EN Blank page...
Страница 30: ...1 4 1 4 002 410 15 EN Blank page...
Страница 46: ...1 7 10 005 142 08 EN Fig 21 turn main switch for starter batteries to the right...
Страница 48: ...005 016 00 EN Blank page...
Страница 49: ...Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN...
Страница 56: ...8 01 2018 Rev16 EN...
Страница 57: ...1 Terms definitions requirements Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN 9...
Страница 58: ...10 01 2018 Rev16 EN...
Страница 78: ...30 01 2018 Rev16 EN...
Страница 104: ...56 01 2018 Rev16 EN...
Страница 105: ...3 Maintenance and special work Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN 57...
Страница 106: ...58 01 2018 Rev16 EN...
Страница 120: ...72 01 2018 Rev16 EN...
Страница 121: ......
Страница 122: ......
Страница 123: ...005 017 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 124: ...005 017 00 EN Blank page...
Страница 126: ...3 2 1 001 855 06 EN Blank page...
Страница 129: ...3 3 3 001 462 06 EN Fig 1...
Страница 130: ...3 3 4 001 462 06 EN Blank page...
Страница 139: ...3 10 5 005 144 04 EN Fig 10 Fig 11 locked release Fig 12 Fig 13...
Страница 150: ...3 20 6 004 551 01 EN Blank page...
Страница 164: ...3 22 14 003 336 15 EN Blank page...
Страница 174: ...3 34 4 004 546 02 EN Blank page...
Страница 180: ...3 37 4 004 910 01 EN Blank page...
Страница 186: ...3 38 6 005 148 02 EN Blank page...
Страница 220: ...3 60 12 002 368 08 EN Blank page...
Страница 224: ...3 80 2 001 156 04 EN Blank page...
Страница 225: ...005 018 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 226: ...005 018 00 EN Blank page...
Страница 232: ...4 3 2 002 878 14 EN Blank page...
Страница 244: ...4 4 12 000 869 22 EN Blank page...
Страница 264: ...4 5 20 000 024 14 EN Blank page...
Страница 268: ...4 10 2 004 073 01 EN Blank page...
Страница 273: ...4 11 001 915 00 EN MAINTENANCE REPORT Maintenance A B C D E F G please enter Date Signature Notes...
Страница 274: ...4 11 001 915 00 EN Blank page...
Страница 275: ...4 11 001 915 00 EN MAINTENANCE REPORT Maintenance A B C D E F G please enter Date Signature Notes...
Страница 276: ...4 11 001 915 00 EN Blank page...
Страница 284: ...4 20 8 004 553 03 EN Blank page...
Страница 292: ...4 30 4 004 491 01 EN Blank page...
Страница 300: ...4 40 8 001 193 16 EN Blank page...
Страница 306: ...4 42 6 004 076 01 EN Blank page...
Страница 324: ...4 44 18 002 514 16 EN Blank page...
Страница 330: ...4 55 6 002 940 02 EN Blank page...
Страница 332: ...4 57 2 004 054 00 EN Blank page...
Страница 340: ...4 60 8 005 151 04 EN Blank page...
Страница 346: ...4 70 2 001 918 05 EN Blank page...
Страница 347: ...005 019 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 348: ...005 019 00 EN Blank page...
Страница 357: ......
Страница 358: ......
Страница 360: ......
Страница 363: ......
Страница 365: ...005 020 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 366: ...005 020 00 EN Blank page...
Страница 372: ...6 8 6 002 720 04 EN Blank page...
Страница 373: ...005 021 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 374: ...005 021 00 EN Blank page...
Страница 390: ...Always Ready 7 30 10 005 023 01 Blank page...