3.23.9.3 HOSE PIPES
Multiple connecting hoses are often connected
with hose pipes in the mobile restoration
operation.
The hoses are usually carried on a specially
equipped truck-mounted concrete pump, laid
before use and removed again after use.
3.23.9.4 INSTALLATION AND OPERATION
OF A HOSE PIPE
The installation of the hose line, as well as its
operation, requires special care and expertise.
DANGER
Danger to life due to flapping hoses!
Block off the danger zone and fix the hoses,
cover hose in a suitable manner if required!
In order to avoid a premature failure and
possible accidents, ensure the following:
- Only use flawless, clean hoses, couplings,
seals, etc. of the same system to structure a
hose.
- The maximum possible concrete pressure
may not exceed the max. permissible
concrete pressure of the pumping line parts.
- The concreting personnel at the placement
site must be informed about possible dangers
and be familiar with all necessary work.
- Place hoses with widest possible radius - Do
not bend.
Too narrow radii cause a one-sided abrasion,
bends will destroy the hose in no time.
Narrow radii and bends favour clogging and
cause the hose to pulsate.
- Do not pull hoses, especially not over sharp
edges.
- Do not twist hoses.
- Do not allow hoses to hang loose.
- Do not beat on the hoses.
- Place hoses and fasten securely with belts.
Do not use incising fixing parts.
- Do not drive over hoses. Place hose pipe in a
protected manner.
- No unauthorised person may remain near the
hose pipe during pumping operation.
- Moisten hose with water, then pump with flow
mixture.
- It is imperative to observe the maximum
aggregate size, depending on the nominal
sizes of the hose.
- Pump with lower delivery rate, hose must not
be disrupted.
Содержание SP 1800-D
Страница 1: ...Original operating instructions Stationary concrete pump EN SP 1800 D SP 2800 D...
Страница 8: ...005 007 00 EN Blank page...
Страница 26: ...1 4 6 004 997 02 EN Blank page...
Страница 30: ...1 4 1 4 002 410 15 EN Blank page...
Страница 46: ...1 7 10 005 142 08 EN Fig 21 turn main switch for starter batteries to the right...
Страница 48: ...005 016 00 EN Blank page...
Страница 49: ...Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN...
Страница 56: ...8 01 2018 Rev16 EN...
Страница 57: ...1 Terms definitions requirements Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN 9...
Страница 58: ...10 01 2018 Rev16 EN...
Страница 78: ...30 01 2018 Rev16 EN...
Страница 104: ...56 01 2018 Rev16 EN...
Страница 105: ...3 Maintenance and special work Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN 57...
Страница 106: ...58 01 2018 Rev16 EN...
Страница 120: ...72 01 2018 Rev16 EN...
Страница 121: ......
Страница 122: ......
Страница 123: ...005 017 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 124: ...005 017 00 EN Blank page...
Страница 126: ...3 2 1 001 855 06 EN Blank page...
Страница 129: ...3 3 3 001 462 06 EN Fig 1...
Страница 130: ...3 3 4 001 462 06 EN Blank page...
Страница 139: ...3 10 5 005 144 04 EN Fig 10 Fig 11 locked release Fig 12 Fig 13...
Страница 150: ...3 20 6 004 551 01 EN Blank page...
Страница 164: ...3 22 14 003 336 15 EN Blank page...
Страница 174: ...3 34 4 004 546 02 EN Blank page...
Страница 180: ...3 37 4 004 910 01 EN Blank page...
Страница 186: ...3 38 6 005 148 02 EN Blank page...
Страница 220: ...3 60 12 002 368 08 EN Blank page...
Страница 224: ...3 80 2 001 156 04 EN Blank page...
Страница 225: ...005 018 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 226: ...005 018 00 EN Blank page...
Страница 232: ...4 3 2 002 878 14 EN Blank page...
Страница 244: ...4 4 12 000 869 22 EN Blank page...
Страница 264: ...4 5 20 000 024 14 EN Blank page...
Страница 268: ...4 10 2 004 073 01 EN Blank page...
Страница 273: ...4 11 001 915 00 EN MAINTENANCE REPORT Maintenance A B C D E F G please enter Date Signature Notes...
Страница 274: ...4 11 001 915 00 EN Blank page...
Страница 275: ...4 11 001 915 00 EN MAINTENANCE REPORT Maintenance A B C D E F G please enter Date Signature Notes...
Страница 276: ...4 11 001 915 00 EN Blank page...
Страница 284: ...4 20 8 004 553 03 EN Blank page...
Страница 292: ...4 30 4 004 491 01 EN Blank page...
Страница 300: ...4 40 8 001 193 16 EN Blank page...
Страница 306: ...4 42 6 004 076 01 EN Blank page...
Страница 324: ...4 44 18 002 514 16 EN Blank page...
Страница 330: ...4 55 6 002 940 02 EN Blank page...
Страница 332: ...4 57 2 004 054 00 EN Blank page...
Страница 340: ...4 60 8 005 151 04 EN Blank page...
Страница 346: ...4 70 2 001 918 05 EN Blank page...
Страница 347: ...005 019 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 348: ...005 019 00 EN Blank page...
Страница 357: ......
Страница 358: ......
Страница 360: ......
Страница 363: ......
Страница 365: ...005 020 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 366: ...005 020 00 EN Blank page...
Страница 372: ...6 8 6 002 720 04 EN Blank page...
Страница 373: ...005 021 00 EN Presentation 1 Safety 2 Operation 3 Maintenance 4 Radio remote control 5 Special equipment 6 Appendix 7...
Страница 374: ...005 021 00 EN Blank page...
Страница 390: ...Always Ready 7 30 10 005 023 01 Blank page...