Preparing for Use
R&S
®
SMBV100A
33
Operating Manual 1407.6062.32 ─ 08
Starting up instruments without power switch
1.
Connect the instrument to the AC supply.
After connection to the AC supply, the instrument is in
,
depending on the state of the ON/STANDBY key at the front panel of the instrument
when the instrument was switched off for the last time.
2. In case the instrument is in standby mode, i.e. the yellow LED is on, press the ON/
STANDBY key to switch the instrument to ready state.
2.3.4.1
Standby and Ready state
The ON/STANDBY key is located in the bottom left corner of the front panel.
Switching between standby and ready state
► Press the ON/STANDBY key briefly to switch the instrument from the standby to
ready state or vice versa.
In ready state, the left, green LED is on. The instrument is ready for operation. All
modules are power-supplied and the R&S SMBV initiates its
In standby state, the right, yellow LED is on. The standby power only supplies the
power switch circuits and the oven-controlled crystal oscillator to keep it at its oper-
ating temperature. In this state it is safe to switch off the AC power and disconnect
the instrument from the power supply.
2.3.4.2
Start Display and Booting
The instrument boots the operating system, starts the instrument firmware and automat-
ically performs a selftest. If the previous session was terminated regularly, the instrument
uses the last setup with the relevant instrument settings.
Once the startup procedure has been terminated, the block diagram opened in the pre-
vious session is displayed and the instrument is ready for operation.
Use the PRESET key to return the instrument to its definite reset/preset state, if the cur-
rent setup is not anymore relevant.
To customize the start settings, use the "File" dialog.
Rebooting the instrument
Press the STANDBY key for approx. 5 s. to reboot the instrument, if the software stops
unexpectedly.
2.3.4.3
Function Check
The signal generator automatically monitors the main functions when the instrument is
switched on and continuously during operation.
Putting into Operation
Содержание SMBV100A
Страница 31: ......
Страница 117: ...Manual Operation R S SMBV100A 100 Operating Manual 1407 6062 32 08 Legend of Front Panel Controls ...