![Rohde & Schwarz SMBV100A Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/rohde-and-schwarz/smbv100a/smbv100a_manual_1477734046.webp)
Preparing for Use
R&S
®
SMBV100A
29
Operating Manual 1407.6062.32 ─ 08
chapter 2.3.3, "Connecting the Instrument to the AC Sup-
EXT MOD
Input for external analog modulation signals.
See also
LF
Output for internal LF modulation generator signal.
chapter 5.4.13.1, "Overview of LF Generator"
FUSES
The R&S SMBV is fully fused by two fuses IEC60127-T3.15H/250 V.
The fuses are accommodated in the fuse holders next to the power connector. Use only
fuses of the mentioned type.
CAUTION!
Danger of shock hazard!. Before replacing the fuses, disconnect the power
cord from the R&S SMBV.
2.3 Putting into Operation
This section describes the basic steps to be taken when setting up the R&S SMBV for
the first time.
Risk of injury and instrument damage
The instrument must be used in an appropriate manner to prevent electric shock, fire,
personal injury, or damage.
●
Do not open the instrument casing.
●
Read and observe the "Basic Safety Instructions" at the beginning of this manual or
on the documentation CD-ROM, in addition to the safety instructions in the following
sections. Notice that the data sheet may specify additional operating conditions.
Risk of instrument damage
Note that the general safety instructions also contain information on operating conditions
that will prevent damage to the instrument. The instrument's data sheet may contain
additional operating conditions.
Putting into Operation
Содержание SMBV100A
Страница 31: ......
Страница 117: ...Manual Operation R S SMBV100A 100 Operating Manual 1407 6062 32 08 Legend of Front Panel Controls ...