GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
10-34
Section 10-9 - When There’s Too Much Leakage Current...
Type BF Patient Leakage Current Test - Probes (This test should be done for all probe)
Type BF Patient Leakage Current Test - Mains to Probe (This test should be done for all probes)
Final Check. All system covers are in place. System scans with all probes as expected.
Accepted by: ______________________________________________________________________
Table 10-23
Tester
Neutral
Tester Polarity
Switch
Ground
Switch
Max Value
Allowed
Value
Measured
OK?
Comments
Closed
Normal
Closed
0.1mA
Closed
Normal
Open
0.5mA
Closed
Reversed
Closed
0.1mA
Closed
Reversed
Open
0.5mA
Open
Normal
Closed
0.5mA
Open
Reversed
Closed
0.5mA
Table 10-24
Tester
Neutral
Tester Polarity
Switch
Ground
Switch
Max Value
Allowed
Value
Measured
OK?
Comments
Closed
Normal
Closed
5mA
Closed
Reversed
Closed
5mA
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...