GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
10-4
Section 10-3 - Maintenance Task Schedule
Surface Probe Leakage
Current Checks
•
Also after corrective
maintenance or as required by
your facilities QA program.
Endocavity Probe
Leakage
Current Checks
•
Also after corrective
maintenance or as required by
your facilities QA program.
Measurement Accuracy
Checks
•
Also after corrective
maintenance or as required by
your facilities QA program.
Probe/Phantom Checks
Check axial and lateral resolution (see Basic
User Manual Technical specifications).
Check Gain and TGC changes, vary the
focus and check reaction on screen.
•
Also after corrective
maintenance or as required by
your facilities QA program.
Functional Checks of all
probes
•
Also after corrective
maintenance or as required by
your facilities QA program.
Table 10-2 Customer Care Schedule
Item
Service at Indicated Time
D
W
M
A
Notes
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...