GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-203
16.) Remove the THRUST NEEDLE BEARING WASHER 5578, THRUST NEEDLE BEARING 5578,
OPIO SWIVEL SHAFT from the UP DOWN LINK ARM in order.
8-50-4
Installation Procedure
Parts to be installed in reverse order on removal. But ROTATION PLATE, OPIO SWIVEL SHAFT,
ROTATE LEVER BRKT and ROTATION MODULE ASSY should be reassembled using new parts.
8-50-5
Functional Check
CAUTION
do
Do not wipe out grease from part.
Test
Refer to
Note
System Exterior Visual Check
section 4-3-1 of LOGIQ P9P7 PSM(GPN : 5599028)
Mechanical Parts Functional Check
section 4-3-2 of LOGIQ P9P7 PSM(GPN : 5599028)
Power On/Off
section 4-3-3 of LOGIQ P9P7 PSM(GPN : 5599028)
System Integration Checks
section 4-3-5 of LOGIQ P9P7 PSM(GPN : 5599028)
OPIO Test only
UP DOWN LINK
THRUST NEEDLE BEARING
OPIO SWIVEL
THRUST NEEDLE BEARING
WASHER 5578
1
2
3
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...