GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-155
Section 8-32
Replacement of the OPIO Tray
8-32-1
Manpower
1 Person, 5 minutes.
8-32-2
Tools
Standard Phillips Screwdriver.
8-32-3
Removal Procedure
1) Remove screw as following figure and carefully remove OPIO Tray.
NOTE:
Make sure not to lose tray fix brkt when removing OPIO Tray.
Figure 8-183 Removal of OPIO Tray
8-32-4
Installation Procedure
Parts to be installed in reverse order of removal.
8-32-5
Functional Check
Visual inspection Only.
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...