GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
8-178
Section 8-45 - Replacement of battery pack for LP7-P9 R2 ext battery pack
7) Lift up POLARIS BATTERY PACK and disconnect BATTERY Harness from PWA. Then remove
POLARIS BATTERY PACK.
NOTE:
Once replacing battery pack, all of battery packs (4 pcs) need to be replaced in same time
.
8-45-4
Installation Procedure
NOTE:
Once replacing battery pack, all of battery packs (4 pcs) need to be replaced in same time.
All components to be installed in reverse order of removal.
8-45-5
Functional Check
1) Turn on the circuit breaker.
Figure 8-212 Removing POLARIS BATTERY PACKS
Figure 8-213 Turning on circuit breaker
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...