Chapter 3 - Setup Instructions
3-21
3-7-2
Power On / Boot Up
3-7-2-1
Scanner Power On
1) Ensure that the wall outlet is of appropriate type, and that the Circuit Breaker is turned off.
2) Uncoil the power cable, allowing sufficient slack so that the unit can be moved slightly.
3) Verify that the power cable is without any visible scratches or any sign of damage.
4) Verify that the on-site mains voltage is within the limits indicated on the rating label on the right side
of the rear panel.
5) Connect the Main Power Cable to the back of the system. Refer to
for details.
6) Connect the Main Power Cable to a hospital grade power outlet with the proper rated voltage.
Never use an adapter that would defeat the safety ground.
7) Switch ON the Circuit at the rear of the system.
Figure 3-9 Circuit and main power cable at rear of system
Circuit Breaker
Main Power
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...