GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 2 - Site Preparation
2-1
Chapter 2
Site Preparation
Section 2-1
Overview
2-1-1
Purpose of Chapter 2
This chapter provides the information required to plan and prepare for the installation of a LOGIQ P9/
P7 ultrasound unit. Included are descriptions of the facility and electrical needs to be met by the
purchaser.
Table 2-1
Contents in Chapter 2
Section
Description
Page Number
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...