GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-127
Section 8-23
Replacement of the COM Express
8-23-1
Manpower
1 Person, 5 minutes.
8-23-2
Tools
Standard Phillips Screwdriver.
8-23-3
Removal Procedure
1) Separate MCB Assy and MDC Assy. (Refer to
)
2) Remove 8 screws around MCB assy and carefully separate MCB assy from MPI assy. Refer to
following figure.
Figure 8-151 Separating MPI and MCB
Carefully disconnect MCB from MPI
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...