GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-117
8-17-17
Installation Procedure - MPI, MCB, MDC, DC4D, HDD, Battery and COM Express
1) Parts to be installed in reverse order of removal.
8-17-18
Functional Check - MPI, MCB, MDC, IO Box
for Functional Diag Test List
8-17-19
Removal Procedure - MBP assy
1) Remove Nest Box from system.
2) Remove MPI, MCB and IO Box out of Nest Frame
3) Remove 4 screws (Circle) and fan connector (Square).
Figure 8-136 Screw points and connector point to remove MBP
4) Remove 6 screws.
Figure 8-137 Screw points to remove MBP
8-17-20
Installation Procedure - MBP assy
Parts to be installed in reverse order of removal.
8-17-21
Functional Check
for Functional Diag Test List.
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...