GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-95
NOTE:
Make sure to connect Touch panel connector to hub board as blow figure.
Figure 8-98 Installation of Touch panel connector
NOTE:
In some cases, when OPIO is replaced the Windows base system may recognize new OPIO as ‘new’
hardware device.
This could bring Touch Panel graphics to top of main screen resulting to have only the wall paper (ping,
cherry blossom) without touch panel buttons.
When this occurs, go into Windows desktop, and double click “OPIO Position Reset” icon.
Alternatively, go to Windows graphics property manager, and bring SCREEN3 to below SCREEN1.
8-14-5
Functional Check
CAUTION
!! CAUTION:
Make sure not to remain any dust on Glass during OPIO Upper Cover and Touch Screen Assy
installation
Test
Refer to
Note
System Exterior Visual Check
Control panel visual check only
Power On/Off
System Integration Checks
OPIO Test only
OPIO Interface Check
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...