GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
8-112
Section 8-17 - Replacement around Nest Box
2) Remove MCWD board from MCB assy. Refer to following figure.
NOTE:
Be careful not to damage CWD connector.
Figure 8-126 Removal of MCWD board.
3) Remove Stud on MCB assy and carefully lift up the MCB assy. Refer to following figure.
Figure 8-127 Stud position on MCB board.
MCWD board assy
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...